Skip to content
Industrial Relations, Oil Mining Resources

BHP iron ore drivers give notice of 24-hour stoppage

Mining and Energy Union < 1 mins read

Iron ore train drivers in the Pilbara have notified BHP they will take a 24-hour stoppage this Friday 16 February as part of their industrial campaign to secure an improved enterprise agreement. 

In a protected action ballot held from 2 to 9 February, 97% of eligible Mining and Energy Union (MEU) members voted yes to industrial action including stoppages and slowdowns. 

MEU WA Secretary Greg Busson said drivers had demonstrated strong resolve to secure improved conditions in areas including rostering and accommodation.  

“These drivers are simply seeking guaranteed conditions in a range of areas that will make a big difference to them and their families,” said Mr Busson.

“Pilbara iron ore mine operators have had it their own way for a long time. Rail crew have done an incredible job getting organised and getting BHP to the bargaining table. 

“They’ve been very patient and given BHP every opportunity to address their concerns. Stopping the trains this Friday sends a strong message to BHP about their unity and determination.” 

MEU rail crew members voted in a previous protected action ballot last October. Following that successful ballot, BHP put a new agreement out to vote, to replace the BHP Billiton Iron Ore Locomotive Drivers Agreement 2014. 

While the offer was an improvement, it did not adequately address members’ priorities and was rejected with a no vote of almost 70% before Christmas.   

The MEU met with BHP again in January with a view to addressing outstanding issues. BHP has not yet responded to these issues, leaving drivers frustrated. 

The MEU applied for a new Protected Action Ballot Order (PABO) as the previous authorisation for protected action had expired. 

 

Contact: Monique Blasiak 0430515162

More from this category

  • Oil Mining Resources
  • 15/01/2025
  • 00:40
Robex Resources Inc.

Updated Kiniero Feasibility Study Achieves Increase +46% in Gold Reserves and +89% NPV to US$322M

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR DISSEMINATION IN THE U.S.HIGHLIGHTS:Increased Reserves Life Of Mine (“LoM”): Mineral Reserves increased by 442,000oz or 46% to 1.41 million ounces from Kiniero's 2023 Feasibility Study (“2023 FS”);Potential to grow Mineral Reserves: Kiniero has Indicated Mineral Resources (inclusive of Mineral Reserves) at 2.2Moz @ 0.96g/t Au, plus Inferred Mineral Resources of 1.53Moz @ 1.05g/t Au (effective September 1 2024); More than 25,000 metres of drilling completed since the database cut off. An updated Reserve Statement to include this drill data is scheduled to be released in Q2 2025;Improved economics: The updated study demonstrates…

  • Business Company News, Oil Mining Resources
  • 14/01/2025
  • 10:03
Jane Morgan Management

Yankuang Energy Receives FIRB Approval for Transformational Transaction with Highfield Resources

14 January 2025 | Highfield Resources Limited (ASX:HFR, “Highfield” or “the Company”) is pleased to announce that Australia’s Foreign Investment Review Board (FIRB) has issued a statement of no objection to Yankuang Energy Group Co., Ltd’s proposed subscription of up to US$376 million in Highfield shares (at A$0.50 per share), marking a significant step in their transaction. Key Highlights FIRB’s decision means that a key condition is satisfied for Highfield’s transformational transaction with Yankuang Energy, which comprises: A US$220 million equity capital raised coming from Yankuang Energy and other investors. The acquisition of the Southey Potash Project in Saskatchewan, Canada,…

  • Contains:
  • Business Company News, Oil Mining Resources
  • 14/01/2025
  • 09:50
Jane Morgan Management

Marmota Limited Confirms Outstanding Heavy Mineral Grades at Muckanippie Titanium Discovery in South Australia

Adelaide, Australia – 14 January 2025 | Marmota Limited (ASX:MEU, “Marmota” or “the Company”) is pleased to announce exceptional assay results from its titanium discovery at the Muckanippie Project, South Australia. The initial metallurgical testwork has confirmed bonanza heavy mineral grades and significant mineralised thicknesses across each of its discovery holes. Key Highlights Exceptional HM Concentrations: WI-081: 28m @ 19.2% HM from surface, including 4m @ 22.2% HM. WI-080: 36m @ 13.5% HM from surface, including 4m @ 27.8% HM. WI-079: 39m @ 13.2% HM from surface, including 4m @ 26.0% HM. WI-078: 24m @ 13.5% HM from surface, including…

  • Contains:

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.