Skip to content
Business Company News, Oil Mining Resources

Pantera Minerals (ASX:PFE) Signs Rig Agreement for First Smackover Well Test at Lithium Brine Project

Jane Morgan Management 3 mins read

Perth, Australia – 10 September 2024 | Pantera Minerals Limited (ASX: PFE) ("Pantera" or the "Company"), an Australian-listed mineral exploration company working on projects in Western Australia, is pleased to announce that it has signed a Master Services Agreement (MSA) with Production Services Inc., an oil and gas services company based in Arkansas, to undertake the re-entry of its first well at the Smackover Lithium Brine Project in Arkansas, USA. This marks a significant step in Pantera’s plan to advance its lithium brine exploration efforts in the highly prospective Smackover Formation.

Highlights:

  • Rig Agreement Secured: Pantera has formalised a rig agreement with Production Services Inc., a company with over 50 years of experience in well servicing in the Arkansas oil and gas sector. Re-entry and testing at the well are expected to commence in mid-October 2024.

  • Initial Well Testing: The re-entry test will focus on sampling brine from the upper Smackover Formation to evaluate lithium concentrations. The lithium grade obtained from these samples will provide the most accurate data to date, supporting the Company's resource modelling efforts and guiding the location of a second well.

  • Industry Momentum: The Smackover Formation is home to several significant lithium brine projects, including Exxon Mobil's (NYSE: XOM) multi-well lithium exploration campaign and Equinor’s (NYSE: EQNR) recent $160 million investment in the region’s brine projects, underscoring the growing interest in the region. 

  • Strategic Location: The first re-entry well is strategically positioned to allow for both production and disposal, creating an opportunity for Pantera to operate a pilot plant in 2025. 

Barnaby Egerton-Warburton, Executive Chairman of Pantera Minerals, stated: “The Company is extremely excited with the imminent testing of lithium brine grade at its Arkansas Smackover Lithium Brine Project. With the contracting of a work-over rig we are now in the final stages of preparation for our first well. The Company believes the Australian market place is not correctly valuing the potential upside of the Company’s project, but is aware of many corporate eyes on the Company, its project and its progress. The Company continues to see aggressive leasing surrounding its exclusive abstract area and now sees its position surrounded by both large listed and privately funded groups.”

Next Steps:

Pantera will continue to collaborate with SLB on the design of the testing procedure, with the well re-entry scheduled to start later this month. The brine samples obtained will be tested by multiple Direct Lithium Extraction (DLE) technology providers, with a focus on identifying the most efficient method for processing the lithium-rich brine. The results of these tests will inform future exploration and resource definition activities, including the planning of a second well and potential pilot plant operations in 2025.

Barnaby Egerton-Warburton
Executive Chairman
bew@panteraminerals.com

Tim Goldsmith
Non-Executive Director
tim@panteraminerals.com

Jane Morgan
Investor & Media Relations
jm@janemorganmanagement.com.au


About us:

About Pantera Minerals Limited:

Pantera Minerals Ltd is an Australia-based mineral exploration company. The Company is an iron ore, copper, gold, manganese, and base metal explorer with a portfolio of projects located across some of Western Australia’s greenstone belts and base-metal basins. Its projects include Yampi Project, Weelarrana Iron and Manganese Project, Hellcat Project and Superbird Lithium Brine Project. The Yampi Project is located about 140 kilometers (km) north of Derby in the Buccaneer Achipelago of the Kimberley. The Weelarrana Iron and Manganese Project is located about 75 km south of Newman with access via the Great Northern Highway and the Jiggalong and Weelarrana North Roads. The Hellcat Project is located about 850 km north-northwest (NNW) of Perth, 230 km NW of Meekatharra and 220 km southwest (SW) of Newman. The Superbird Lithium Brine Project covers a land position of about 22,000 gross acres and 13,457 net leased acres of lithium brine prospective ground in the Smackover Formation.


Contact details:

Jane Morgan
Investor & Media Relations
jm@janemorganmanagement.com.au

Media

More from this category

  • Oil Mining Resources
  • 16/10/2024
  • 03:11
HPX Mines Limited

HPX welcomes formation of Liberian National Railway Authority

• HPX congratulates Liberian President Boakai for establishing the Liberian National Railway Authority (“NRA”) through Executive Order No. 136• The NRA will oversee and manage Liberia’s National Rail Assets ensuring management and oversight are guided by principles of efficiency, transparency and equitable use by all stakeholders• Executive Order No. 136 provides the clear legal and operating framework necessary to unlock the transformative Liberty Corridor Project• HPX senior management currently in Monrovia and working with Government to conclude rail access agreements for the existing Yekepa – Buchanan line• Upon signing rail access agreements HPX will commence Phase 1 operations from Kon Kweni to tranship iron…

  • Business Company News, Oil Mining Resources
  • 15/10/2024
  • 12:22
Jane Morgan Management

Titan Minerals Discovers High-Grade Gold in Extensional Trenches at its Dynasty Gold Project

Perth, Australia – 15 October 2024 | Titan Minerals Limited (ASX: TTM) ("Titan" or "the Company") is pleased to announce the discovery of high-grade gold in new extensional trenches at its wholly-owned Dynasty Gold Project in southern Ecuador. Recent trenching and surface geochemical sampling confirm the presence of high-grade gold-silver veins, extending the mineralisation footprint at the Iguana prospect. Highlights: Exceptional Trenching Results: New trenching at Iguana South has returned an outstanding intercept of 3.0m @ 21.4 g/t Au & 14.1 g/t Ag, confirming a high-grade vein that has never been drill-tested. Additional trench results include: 1.8m @ 4.5 g/t…

  • Contains:
  • Business Company News, Oil Mining Resources
  • 15/10/2024
  • 09:47
Jane Morgan Management

Arizona Lithium Completes Construction of Pad #3 at Prairie Project

Perth, Australia – 15 October 2024 | Arizona Lithium Limited (ASX: AZL, AZLO, OTC: AZLAF) (“Arizona Lithium” or “the Company”) is pleased to announce that it has successfully completed the construction of Pad #3 at the Prairie Lithium Project in Saskatchewan, Canada. This marks a significant milestone in the Company’s development plan, with drilling set to commence in the coming weeks. Highlights: Pad #3 Completed: Arizona Lithium has completed construction of Pad #3, with drilling to commence shortly. It is the third pad identified for lithium production at the Prairie Project. Target Production of 6,000tpa LCE: With three pads cleared,…

  • Contains:

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.