Skip to content
Business Company News, Oil Mining Resources

Austral Resources Limited (ASX:AR1) Completes Anthill’s West Pit

Jane Morgan Management 2 mins read

Austral Resources Limited (ASX:AR1) Completes Anthill’s West Pit

28 January 2025 – Sydney, Australia | Austral Resources Australia Ltd (ASX:AR1) is pleased to announce the successful completion of the West Pit at its Anthill Mine, representing a major milestone in the company’s growth strategy. 

Highlights

  • High-Grade Copper Ore Identified and Extracted: An additional 18kt of high-grade copper ore was identified and safely extracted from below the original pit shell design.

  • Production Stats:

    • 2.4 million wet tonnes of copper ore extracted at an average grade of 0.65% Cu.

    • 7.6 million wet tonnes of waste extracted, including 200kt of in-pit dumping.

    • 239km of linear drill meters completed. 

Austral successfully navigated two consecutive extreme wet seasons (2022–2023), which included high rainfall in the area, challenging ground conditions, and groundwater ingress of up to 20 liters per second. 

Additionally, the onboarding of a new mining contractor in August 2024, ReGroup, required careful management for ensuring production continuity and proper adherence to quality standards. 

With the completion of the West Pit, Austral will now direct its production efforts toward the East Pit at Anthill, with plans to complete operations before the 2026 wet season. 

Commenting on the progress, Company Chairman, David Newling, stated: “This achievement, similarly to our recent MOU with NFM, demonstrates our outstanding operational capability. We are a lean and nimble company focussed on improving and expanding its mining and processing capabilities to achieve the results our shareholders expect.”

For Further Information:

Investor Relations
Jane Morgan 
Jane Morgan Management
[email protected]

 


About us:

About Austral Resources Limited:

Austral Resources Australia Ltd is an Australia-based copper producer, developer and explorer located in the Mt Isa District of northwest Queensland. The Company’s projects include Anthill Project, Lady Annie Project, Cameron River Project, and Miranda Project. The Anthill Project area lies within the Lady Annie Project, and it is located 45 kilometers (km) from the Mt Kelly processing facility. The Lady Annie Project tenements are in the Western Fold Belt of the Mount Isa Inlier. The Cameron River Project tenements lie within the Eastern Fold Belt of the Mount Isa Inlier with the northern most tenement close to the boundary with the Central Kalkadoon-Leichardt Belt. The tenements are prospective for copper, gold and rare earths. The Miranda Project tenements lie predominantly within the Central Kalkadoon-Leichardt Belt of the Mount Isa Inlier, with one tenement (EPM 17646) occurring within the Mary Kathleen Group of the Easter Fold Belt. 


Contact details:

Jane Morgan 
Jane Morgan Management
Investor & Media Relations
[email protected]

Media

More from this category

  • Business Company News, Medical Health Aged Care
  • 10/11/2026
  • 16:25
JMM

Sofdra® receives the International Hyperhidrosis Society Seal of Recognition(TM)

PHOENIX, USA – 10 November 2026: Commercial dermatology company, Botanix Pharmaceuticals Limited (ABN 70 009 109 755) (ASX:BOT, “Botanix” or “the Company”), is pleased…

  • Contains:
  • Business Company News
  • 10/11/2026
  • 13:28
Australia RS Doors & Windows Pty Ltd

Top Aluminium Window and Door Suppliers in Sydney for 2026: A Comparison of Thermal Performance, Slimline Systems and Compliance Documentation

A 2026 technical specification and compliance audit for Sydney builders, architects and homeowners evaluatingpolyamide thermally broken systems, 22 mm slimline doors and full-home double-glazing upgrades Across Greater Sydney in 2026, rising NSW BASIX thermal thresholds, wider indoor-outdoor architectural openings and stricter certifier scrutiny on AS 2047 documentation have reshaped how builders, architects and homeowners evaluate window and door tenders. Instead of comparing headline square-metre rates on uninsulated single-glazed frames, procurement teams now audit suppliers across three non-negotiable engineering criteria: polyamide thermal-break frame architecture, ultra-slim 22 mm sliding door sightlines, and verifiable SAI Global StandardsMark certification schedules. To address all three…

  • Government VIC, Oil Mining Resources
  • 10/11/2026
  • 11:32
MEU

Nationals’ $20 million pledge welcome, but Latrobe Valley needs more support

The Mining and Energy Union has welcomed the Nationals’ $20 million Latrobe Valley jobs and industry pledge as a positive step and called on all parties to back the union’s $102 million Jobs for Tomorrow plan ahead of Yallourn’s closure in 2028. MEU Victorian President Andy Smith said the announcement recognised the need to bring new industries and jobs to the Valley, but the funding fell well short of what workers and their communities have already identified. “Twenty million dollars is a start, but it won’t touch the sides of what’s needed as Yallourn closes,” Mr Smith said. “The Nationals…

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.