Skip to content
Manufacturing

IperionX – March 2025 Quarterly Report

IperionX 3 mins read
CHARLOTTE, N.C--BUSINESS WIRE--

IperionX Limited (IperionX) (NASDAQ: IPX, ASX: IPX) is pleased to present its quarterly report for the period ending March 31, 2025. Key highlights during and subsequent to the end of the quarter include:

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250415677727/en/

IperionX titanium production facility equipment and powder to parts manufacturing equipment.

IperionX titanium production facility equipment and powder to parts manufacturing equipment.

Commercial Operations – On Track and Accelerating

  • Commissioning of the Titanium Manufacturing Campus in Virginia progressed rapidly during the quarter, with full system scrap-to-forged titanium product operational capacity expected by mid-2025.
  • Repeated production cycles of the Hydrogen Assisted Metallothermic Reduction (HAMR™) furnace continue to successfully produce high-quality titanium that exceeds industry standards.
  • Commissioning-phase process improvements have reinforced the low-capex scalability of the HAMR process, and underscore strong potential to surpass original nameplate titanium powder production.
  • Commissioning of initial pressing and Hydrogen Sintering and Phase Transformation (HSPT™) sintering systems is complete, enabling forged near-net-shape titanium production.

Expanding Commercial and Strategic Customer Partnerships

  • Product development and qualification continues to build momentum across key customer sectors - defense, automotive and consumer electronics.
  • Strong customer engagement for high-performance titanium components that suffer from historically low material yields (high scrap rates) - such as titanium fasteners, housings, and precision components.
  • IperionX is actively working on pilot production, with eight commercial partners supporting a rapid path-to-market for high-performance titanium manufactured components.

Continued Momentum in U.S. Government Engagement

  • IperionX was awarded up to $47.1 million in U.S. Department of Defense (DoD) funding to accelerate development of a secure, low-cost, mineral-to-metal titanium supply chain. An additional $11.0 million in financing was approved by the U.S. Export-Import Bank for advanced manufacturing equipment.
  • IperionX is progressing long-term, tax-exempt bond financing through Virginia’s Halifax County Industrial Development Authority to underpin future titanium production expansions.
  • Multiple additional government funding applications are underway, with strong potential for fast-track review under the new U.S. administration.

Titanium Production Expansion Plans Underway

  • The DoD award provided the catalyst to commence engineering and design for expansion of titanium production capacity at the Titanium Manufacturing Campus.
  • Expansion of titanium production capacity is targeted by the end of 2026, with future modular-based production expansions scoped through to 2030. Expansion plans are expected to be released mid-2025.

Titan Project - DFS Underway for U.S. Critical Minerals Supply

  • Definitive Feasibility Study (DFS) commenced at the Titan Critical Minerals Project, funded in part by the recent U.S. DoD award. The Titan Project is the largest critical mineral sands project in the U.S.
  • The DFS, expected to be completed in Q2 2026, will define engineering, flowsheets, and infrastructure for long-term supply of titanium feedstock and heavy rare earths, including dysprosium and terbium - key elements for high-performance magnets and defense systems.

Strong Financial Position

  • At March 31, 2025, IperionX held US$66.1 million in cash

A link to the full announcement can be found here.


Contact details:

Anastasios (Taso) Arima, Founder and CEO
Toby Symonds, President
Dominic Allen, Chief Commercial Officer

Investors: [email protected]
Media: [email protected]

+1 980 237 8900
www.iperionx.com

Media

More from this category

  • Business Company News, Manufacturing
  • 08/07/2025
  • 10:38
Jane Morgan Management

Amaero Unlocks Velo3D Supply Agreement with Powder Certification from Auburn’s NCAME

Sydney, Australia – Amaero Ltd (ASX:3DA, OTC: AMROF) (“Amaero” or “the Company”) has entered into a strategic collaboration with Auburn University’s National Center for Additive Manufacturing Excellence (NCAME) to accelerate development and testing of its proprietary C103 and Ti64 alloy powders. The collaboration has already delivered key milestones. NCAME has verified that Amaero’s powders meet key aerospace and additive manufacturing standards, including ASTM F3635 for C103 and AMS7015/ASTM F3001 for Ti64. As a result, Amaero has met the powder qualification condition set by advanced 3D printing company Velo3D - clearing the way for initial commercial orders. Velo3D has now placed…

  • Contains:
  • Manufacturing, Oil Mining Resources
  • 08/07/2025
  • 08:00
Schaeffler Australia

OPTIME digital lubrication meets the challenges of flip-flop wet, fine, and waste screening technology to deliver safety, sustainability, and reliability 24/7

Flip-flop screening technology isincreasingly widely used in waste management, mineral processing, and recycling in Australia and New Zealand, to separate materials that are sticky,…

  • Contains:
  • Engineering, Manufacturing
  • 07/07/2025
  • 08:00
LAPP Australia

Cabling and automation leader LAPP Australia launches its own Harnessing Solutions division to boost productivity, quality, and safety

One of the world’s leading providers of branded cable and connector systems, LAPP, is introducing to Australia a dedicated Harnessing Solutions Division to help…

  • Contains:

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.