Skip to content
Industrial Relations, Oil Mining Resources

Media Alert: Striking Mudgee Miners to March Demanding Fair Pay

Mining and Energy Union < 1 min read

When: Thursday 24 July, 10:00am 
Where:  Victoria Oval to Lawson Park (Mudgee)

Ulan Underground mineworkers will be marching in Mudgee this Thursday morning, demanding fair pay from their employer Swiss multinational Glencore.

Fed-up MEU miners are continuing action following 16 months of enterprise bargaining negotiations that has failed to secure an acceptable agreement for the workers. The Ulan miners are seeking their pay to be lifted in line with the nearby Ulan West underground mine. Glencore, which owns and operates both mines, is refusing to match the rates.

The mineworkers will be demonstrating their determination to secure a fair deal in a march and rally and are to be joined by supporters from the local community and mining industry.


Contact details:

Emily Holm
0400 382 271 
[email protected]

More from this category

  • Oil Mining Resources
  • 07/10/2026
  • 22:07
ATHA Energy Corp

ATHA Energy Successfully Completes Diamond Drilling at RIB North Discovery, Expanding Strike Length To 3.4 Km, And Identifies a Higher-Grade Sub Zone: Results Include RIBN-DD-023 Intersecting 19.5 M Of Composite Uranium Mineralization With 2.0 M Of

HIGHLIGHTS Preliminary results from the final seven diamond drillholes (See July 9th and September 8th, 2026 news releases for other preliminary results) completed along…

  • Contains:
  • Oil Mining Resources
  • 07/10/2026
  • 22:07
Q2 Metals Corp

Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li2O and 101.6 Metres at 1.02% Li2O

Highlights:CS26-096: two (2) separate intervals, including: 134.5 m at 1.20 % Li2O (starting at surface), and101.6 m at 1.02 % Li2OThe entire 101.6 m interval in hole-96 is outside of the conceptual pit-shell defined in the April-2026 MRE.  CS26-095: 10 separate intervals, including: 70 m at 1.28 % Li2O,31.3 m at 1.00 % Li2O, and25.7 m at 1.33 % Li2O.CS26-094: two (2) separate intervals, including: 29.2 m at 1.53 % Li2O, and19.3 m at 1.84 % Li2O.A total of 19,521 m over 43 drill holes has been completed to date during the 2026 Summer Drill Program and five (5) drill rigs…

  • Oil Mining Resources, Political
  • 07/10/2026
  • 13:28
Nuclear for Australia

SA Labor Treasurer: “Nuclear conversation is just beginning”

Speaking at the Global Uranium Conference in Adelaide today, South Australian Treasurer Tom Koutsantonis said Australia’s nuclear conversation is just beginning and emphasised the role South Australia’s uranium is playing to support global decarbonisation energy needs. Nuclear for Australia Founder Will Shackel said commonsense policy changes need to follow at both state and federal levels. “It’s encouraging to hear a Labor politician recognise nuclear energy for what it is: a clean energy source and a player in the global energy transition,” Mr Shackel said. “Nuclear energy operates safely in more than 30 countries around the world delivering, the latest IAEA…

  • Contains:

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.