Skip to content
Oil Mining Resources

Astute Metals NL (ASX: ASE) Drilling of Gold-Silver Targets Commences at Needles Project

Astute Metals NL (ASX: ASE) 3 mins read

Key Highlights
• Eight-hole / 1,170m RC drilling campaign underway at the Needles Gold Project in Nevada, USA.

• Six priority targets to be drill-tested:
• Eastern Shaft - Rock-chip samples of up to 33g/t Au and 622g/t Ag proximal to a historical mine shaft.
• Tomahawk - 200m-long trend at the Tomahawk Mine, with assays up to 5.54g/t Au and 406g/t Ag.
• Arrowhead Mine - 107m-deep, 4-level mine with along-strike intersections including 3.42m @ 2.92g/t Au and 905g/t Ag.
• Arrowhead East – Two drill targets with strong arsenic pathfinder grades ranging from 1,860ppm to 6,640ppm, gold grades of up to 1.1g/t Au and silver of up to 5.5g/t Ag.
• Whopper Junior - Strong pathfinder anomalism in antimony, arsenic and mercury. 

• Company expects to complete drilling within two weeks and mobilise the rig to commence drilling at its 100%- owned Red Mountain Lithium Project. 

Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to advise that Reverse Circulation (RC) drilling has now commenced at its Needles Gold-Silver Project in Nevada, USA. A series of six high-priority vein-style gold-silver targets will be tested as part of the eight-hole campaign.

The Company has engaged experienced international drill contractor, Major Drilling Group International Inc. (“Major”), to undertake the drilling program.

Despite having significant sampling and drilling, the Needles Gold Project remains largely underexplored, with most holes only drilled to shallow depths and a number of high-grade previously undrilled prospects identified that will be tested as part of the current campaign.

Drilling is expected to be completed within two weeks, after which the rig will mobilised to the Red Mountain Lithium Project to complete further drilling in the lead up to a maiden Mineral Resource Estimate planned for the end of the calendar year. 

Astute Chairman, Tony Leibowitz, said:
“The start of drilling at Needles marks the beginning of a very active phase of activity for the Company, coinciding with our imminent name change. The current drill program will test six initial high-priority prospects identified from a recent exploration review. This work has uncovered what we believe to be highly prospective discovery opportunities in gold in a richly endowed historical mining area at a very favourable time for the gold sector.

“Each of the targets has demonstrated either high-grade historical gold-silver assays or compelling anomalism for pathfinder elements, with the potential to deliver new discoveries for Astute in one of the world’s premier gold and silver mining districts.

“Once the drilling at Needles wraps up, the rig will immediately move on to the Red Mountain Lithium Project, where a major program is planned to lay the foundations for our maiden Mineral Resource Estimate by the end of the year.” 

Background 
The Needles Project comprises 216 unpatented lode mining claims covering an area of 18km2 and lies 92km east of the mining town of Tonopah in Nye County, Nevada, USA (Figure 6). The project was acquired due to its geological similarities with bulk-tonnage gold operations in Nevada such as the 20Moz+ Round Mountain mine8

Previously known as the Arrowhead district, the project includes numerous historical gold-silver workings dating from the early 1900’s to 1920’s, with some of notable scale. While historical records are sparse, the Arrowhead Mine is recorded as an incline shaft to 350ft (106.7m) with drifting on four levels, and the Arrowhead Extension Mine was a 150ft (45.7m) two-compartment shaft with two working levels. These operations mined bonanza-style epithermal vein gold and silver mineralisation.

The current project area has seen a number of previous explorers including Newcrest (2002-04), Taranis Resources (2002-07), Excalibur Resources (2007-09) and Greenock Resources, amongst others. The Needles Project is hosts a large, under-explored epithermal system fertile for gold and silver, with rock chip results of up to 33g/t Au and 1,115g/t Ag3 . Existing drilling is mostly shallow, and alteration mineralogy and pathfinder geochemistry suggests that the most prospective exploration space is yet to be tested. 

To read the announcement, please click here


About us:

About Astute Metals NL

Astute Metals NL is a diversified ASX-listed exploration company driven to create value through discovering and developing deposits of critical metals required for electrification and the global energy transition, with a principal focus on lithium and copper.

The Company is focused on rapidly advancing its recent Red Mountain Lithium Discovery, located in the battery metals capital of the US, Nevada, and exploring for world-class copper-gold deposits in the Northern Territory.


Contact details:

Matt Healy
Executive Director & CEO
[email protected] 
+61 (0) 431 683 952

Nicholas Read
Media & Investor Relations
[email protected]
+61 (0) 419 929 046

More from this category

  • Oil Mining Resources
  • 23/12/2025
  • 13:17
European Metals Holdings

CINOVEC DFS CONFIRMS LONG-LIFE BATTERY-GRADE LITHIUM CARBONATE PRODUCER STRATEGICALLY POSITIONED TO SUPPLY EUROPEAN EV AND ENERGY-STORAGE SECTORS

European Metals Holdings Limited (“European Metals” or “the Company”) announces the results of the Definitive Feasibility Study (DFS) for the Cinovec Lithium Project (Cinovec…

  • Contains:
  • Oil Mining Resources
  • 23/12/2025
  • 13:10
Island Passage Development Canada Limited

Island Passage Exploration Reports on First Porphyry Copper-Style Mineralization Encountered on its EL02 Project Bougainville Island, Papua New Guinea

ARAWA, Papua New Guinea, Dec. 22, 2025 (GLOBE NEWSWIRE) -- Island Passage Exploration Limited (IPX or the “Company”) has made extensive progress during the last three quarters in its copper-gold exploration program at the EL02 exploration license in the Autonomous Region of Bougainville (AROB), Papua New Guinea (Figure 1).Figure 1 - Location Map of Bougainville Island and EL02 LicenseFielding two geological teams in alternating field rotations on the EL02 project since March of this year, the pace of work has increased markedly. In addition to the large-scale stream sediment anomalies and high-grade veins already reported during 2024 and early this…

  • Oil Mining Resources
  • 22/12/2025
  • 09:40
Robex Resources Inc.

Robex Pours First Gold at Kiniéro on Schedule and Budget

Highlights:Gold bar weighing 2.64 kilograms (85 oz) poured in the first smelt on site at the Kiniéro Gold Project, Guinea.First gold delivered on schedule and within budget.Nearly 5 million hours worked without a Lost Time Injury (LTI).Ramp-up progressing smoothly; plant achieving recoveries in line with expectations.Kiniéro plant expected to reach nameplate capacity in early Q1 CY2026.Open-pit mining ramping up from South Sabali starter pit, with ore stockpiles continuing to build on the ROM pad.Matthew Wilcox appointed Managing Director & CEO in May 2024; construction team mobilised July 2024. Construction completed in 17 months—the team’s sixth successful build in 15 years,…

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.