Skip to content
Business Company News, Oil Mining Resources

American Uranium Appoints Petrotek for Key Hydrogeological Testing at Lo Herma Project

Jane Morgan Management 2 mins read

Perth, Australia – American Uranium Limited (ASX:AMU; OTCID:AMUIF) has appointed specialist subsurface engineering group Petrotek Corporation to undertake hydrogeological testing at its flagship Lo Herma in-situ recovery (ISR) uranium project in Wyoming’s Powder River Basin, as part of a broader program to expand and upgrade the project’s 8.57 million-pound uranium resource.

The testing - set to commence in November 2025 - will run concurrently with Phase 1 of the project’s two-phase resource development drilling campaign, which targets approximately 50 holes aimed at growing the current resource base and increasing confidence in existing mineralisation. Results will underpin an updated Mineral Resource Estimate and Scoping Study scheduled for release in 2026.

Petrotek, a leading U.S. consultancy with nearly three decades of experience in ISR wellfield design and aquifer analysis, will perform step-drawdown (pump) testing to assess aquifer performance, sustainability, and transmissivity - key metrics for ISR mining.

Commenting on the important milestone, CEO and Executive Director, Bruce Lane confirmed:

Our upcoming hydrogeological testing and resource development drilling programs at Lo Herma represent major steps toward advancing one of America’s most promising ISR uranium projects. Lo Herma is one of the few near-term, low-cost ISR projects in the U.S. and the hydrogeological testing to be undertaken by Petrotek aims to validate our initial aquifer observations and affirm our confidence in the aquifer transmissivity. We are delighted to have secured Petrotek’s significant expertise and experience with analogous ISR uranium projects in the Powder River Basin.

In addition, the drilling campaign will target both growth in the current 8.57Mlb resource base and increased confidence in existing mineral resources along with further validation of the project’s hydrogeology.

This work is expected to feed into an updated Mineral Resource Estimate and Scoping Study in 2026, positioning us to deliver value from America’s nuclear energy revival.

Next Steps

Hydrogeological testing will be conducted on the four monitor wells completed earlier this year, which confirmed the Lo Herma mineralisation lies within a saturated aquifer suitable for ISR mining. Laboratory testing of drill core samples previously returned hydraulic parameters consistent with efficient ISR wellfield operations.

Following the November program, American Uranium plans further long-term aquifer testing and installation of additional monitoring wells to support future mine-permit applications.


ENDS

 

Follow us:

Website: www.americanuranium.com.au

LinkedIn: @American Uranium
X: @asx_amu


About us:

About American Uranium
American Uranium Limited (ASX:AMU; OTCID:AMUIF) is focused on defining and developing economic in-situ recovery (ISR) uranium resources as part of the U.S. domestic uranium mining revival. AMU’s flagship and most advanced Lo Herma Project leads the Company’s project portfolio and is strategically positioned in Wyoming’s Powder River Uranium Basin, the most significant uranium production district in the U.S.


Contact details:

Jane Morgan
Investor & Media Relations Manager
M: +61 405 555 618
[email protected]

More from this category

  • Business Company News, Oil Mining Resources
  • 23/01/2026
  • 15:14
CIMIC Group

CIMIC Group companies awarded contracts for zinc tailing recycling facility in India

CIMIC Group companies Sedgman and Leighton Asia have been awarded separate contracts by Hindustan Zinc Limited (HZL), the world’s largest integrated zinc producer and…

  • Contains:
  • Business Company News, Human Resources
  • 23/01/2026
  • 12:35
ReFresh

$1.3M raised to help employers meet Australia’s new nationwide psychosocial safety obligations

$1.3M raised to help employers meet Australia’s new nationwidepsychosocial safety obligations From1 December 2025, psychosocial hazardsare formally regulatednationwide, requiring employers to identify, assess, control, and manage psychosocial risks with the same rigour as physical safety hazards. These changes place new expectations on organisations to demonstrate ongoing oversight, structured risk management, and defensible compliance. ReFresh, a workplace psychosocial compliance and HR risk management platform, has raised a $1.3M pre-seed round to support organisations responding to Australia’s newly mandatory psychosocial safety obligations under workplace health and safety law. ReFresh has been built specifically for this regulatory shift, providing organisations with a single…

  • Oil Mining Resources
  • 22/01/2026
  • 23:10
Q2 Metals Corp

Q2 Metals Extends Known Mineralized Zone with 179.2 Metre Intercept of 1.24% Li2O at the Cisco Lithium Project

Highlights:CS25-065: Five (5) separate intervals, including:179.2 m at 1.24% Li2O; and15.7 m at 1.48% Li2O. Drill hole CS25-065, located north of the known Mineralized Zone and west of the CO1 outcrop, extends the system to the north at shallow depths where mineralization was not expected.CS25-057: Six (6) separate intervals, including:49.8 m at 1.41% Li2O; and35.8 m at 1.51% Li2O.To date, a total of 74 drill holes for 31,961 m have been completed at the Cisco Project with assays pending on the remaining holes drilled during the winter 2025 campaign.Drilling has now resumed at the Cisco Project, with a four-rig program primarily…

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.