Skip to content
Business Company News, Oil Mining Resources

American Uranium Advances Lo Herma Development with Successful Hydrogeological Testing and Ongoing Drilling

Jane Morgan Management 2 mins read

Perth, Australia – American Uranium Limited (ASX:AMU; OTCID:AMUIF) is pleased to advise that it has achieved an important technical milestone at its flagship Lo Herma In-Situ Recovery (ISR) Uranium Project in Wyoming’s Powder River Basin, completing a major phase of hydrogeological testing while continuing its resource-expansion drilling program.

The Company confirmed that all wells demonstrated sustained flows and minimal aquifer drawdown, validating key hydrologic characteristics necessary for ISR development. Final results from specialist consultancy Petrotek Corporation are expected before the end of 2025. Testing was completed under the supervision of senior hydrogeologists, with full adherence to ISR field protocols.

Drilling also continues across the northern extensions of proposed Mine Units 1 and 2, where AMU has now completed 38 holes to date. Preliminary geological observations show continuity of mineralised sands and favourable redox conditions - supportive of resource growth ahead of a 2026 Mineral Resource Estimate (MRE) update.

The combined hydrogeologic and drilling programs are designed to de-risk and advance Lo Herma ahead of an updated Scoping Study planned for 2026.

American Uranium CEO and Executive Director Bruce Lane confirmed:

We are very pleased that the hydrogeological testing program at Lo Herma has been completed as scheduled, with all wells demonstrating sustained flows and minimal aquifer drawdown for the full duration of the tests. The initial test observations are highly encouraging, and we look forward to receiving Petrotek’s report before the end of the year.

Resource expansion drilling has also been progressing as planned, with continuity of mineralised sands and redox conditions observed in the areas north of the proposed Mine Units 1 and 2. Drilling operations are continuing in the area north of Mine Unit 2 before moving back to an area closer to Mine Unit 1. Drilling results will be provided at the conclusion of the resource expansion program in advance of a planned resource update in 2026.

The aquifer testing and drilling programs are targeting improved resource and hydrogeologic confidence as we progress toward an update of the Lo Herma Scoping Study in 2026.


About the Hydrogeological Program

The pump-testing campaign - completed on four previously installed monitor wells during the week of 17 November - was conducted using step-drawdown and sustained-pumping methods. Key parameters recorded included:

  • flow rates

  • water levels

  • aquifer response indicators
    all demonstrating the hydrogeologic suitability of Lo Herma for ISR extraction methods.


About the Drilling Program

Drilling is focused on two priority zones:

  • North of Mine Unit 1: 31 holes completed, targeting extensions of mineralisation at ~275m depth.

  • North of Mine Unit 2: 7 holes completed to date, targeting deeper mineralised sands at up to 425m depth, building on the significant 2024 discovery which remains open to the north.

Road and site-access upgrades are also underway to support continued drilling prior to the end-of-year shutdown.


ENDS


About us:

About American Uranium
American Uranium Limited (ASX:AMU; OTCID:AMUIF) is focused on defining and developing economic in-situ recovery (ISR) uranium resources as part of the U.S. domestic uranium mining revival. AMU’s flagship and most advanced Lo Herma Project leads the Company’s project portfolio and is strategically positioned in Wyoming’s Powder River Uranium Basin, the most significant uranium production district in the U.S.


Contact details:

Jane Morgan
Investor & Media Relations Manager
M: +61 405 555 618
[email protected]

Media

More from this category

  • Business Company News
  • 16/01/2026
  • 15:06
Alpha

Turnaround strategy delivering margin expansion and improved revenue trajectory

Articore continues to execute its turnaround strategy, delivering significant growth in gross profit after paid acquisition (GPAPA) and an improvement in the Group’s marketplace revenue (MPR) trajectory. Overview MPR showed clear signs of improvement in 2QFY26, declining 3.2% (versus a 6.6% decline in 1QFY26) reflecting enhanced paid marketing effectiveness and optimisation of pricing and promotional strategies. 1HFY26 gross profit increased 6.0% driven by supply chain synergies and new artist account fees. 1HFY26 GPAPA increased 8.9% due to higher gross profit and improved efficiency in paid marketing. Financial highlights The following table details the Group’s quarter ended 31 December 2025 (2QFY26)…

  • Government Federal, Oil Mining Resources
  • 16/01/2026
  • 11:48
Cement Concrete & Aggregates Australia

Productivity Commission report reinforces case for meaningful circular construction reform

Key Facts: CCAA endorses Productivity Commission's final report on circular economy, supporting removal of regulatory barriers for recycled materials in constructionReport calls for shift from prescriptive standards to performance-based regulations and national harmonisation of state-based specificationsNational stocktake of infrastructure standards recommended, particularly focusing on cement and concrete standardsCurrent Australian Cement Standard AS 3972-2010 needs updating to accommodate modern materials and emissions reduction whilst maintaining safetyIndustry supports cross-jurisdictional coordination to enable circular construction and infrastructure delivery whilst transitioning to net zeroCement Concrete & Aggregates Australia (CCAA) has welcomed the Productivity Commission’s final report into Australia’s circular economy: unlocking the opportunities, saying…

  • Business Company News, Oil Mining Resources
  • 16/01/2026
  • 09:44
Jane Morgan Management

Austral acquires Lady Loretta mine to significantly expand copper growth pipelin

Austral Resources Australia Ltd (ASX:AR1) has entered into an agreement with Glencore AG to acquire the Lady Loretta mining leases, associated exploration permits and site infrastructure, a strategic transaction that materially strengthens Austral’s copper growth pipeline and balance sheet. The acquisition consolidates Austral’s tenure immediately adjacent to its Lady Annie Copper Mine in North West Queensland, unlocking near-term and longer-term opportunities to add copper feedstock to the Company’s Mt Kelly processing plant. Under the transaction, Austral will acquire 100% of Noranda Pacific Pty Ltd, owner and operator of the Lady Loretta mine. At completion, Glencore will pay Austral US$40.0 million…

  • Contains:

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.