Skip to content
Finance Investment, Oil Mining Resources

Challenger Exploration (ASX:CEL) – Initial Mineral Resource Estimate of 4.5 Moz gold-equivalent1 at CEL’s 100% owned El Guayabo Project, Ecuador and Completion of $10 million Placement

Challenger Gold (ASX: CEL) 2 mins read

Highlights

  • Initial Inferred Mineral Resource Estimate (MRE) of 270 mt at 0.52 g/t AuEq1 for 4.5 Moz AuEq1 at CEL's 100% owned El Guayabo Project in Ecuador (refer Table 1).
  • The 4.5 Moz1 MRE contains a significant higher-grade core of mineralisation (refer Table 2):
    • 1.45 Moz at 1.0 g/t AuEq1 (0.65 g/t AuEq cut-off) including;
    • 1.01 Moz at 1.2 g/t AuEq1 (0.8 g/t AuEq cut-off) ) including;
    • 0.63 Moz at 1.5 g/t AuEq1 (1.0 g/t AuEq cut-off).
  • The MRE is predominantly based on drilling at the GY-A and GY-B anomalies and is constrained by drilling with mineralisation remaining open in both directions along strike and at depth.
  • MRE does not include drill holes GYDD-23-039 (805.3m at 0.6 g/t AuEq) or GYDD-23-040 to 043 (assays pending) and will be updated upon the receipt of assays for these final five holes.
  • Discovery Cost of approximately US$1.202 per ounce.
  • Transforms CEL into a two-project company with gold equivalent resources of 2.8 Moz4 in Hualilan and 4.5 Moz1 in Ecuador, both of which remain open.
  • Firm commitments received to raise $10 million by way of an institutional placement, with strong support received from domestic and offshore institutional investors
  • Funds from the capital raising to be primarily applied to:
    • Completion of a Pre-Feasibility Study (PFS) at CEL's Flagship Hualilan Gold Project;
    • Regional exploration activities and drilling at Hualilan.

Commenting on the resource, CEL Managing Director, Mr Kris Knauer, said 

“I would like to congratulate our Exploration team in Ecuador for this outstanding start. An initial resource of 4.5 million ounces1 , particularly given its higher-grade core of 1.5 Moz at 1.0 g/t AuEq, is a great start and has significant value in its own right. 

It is, however, only our starting point. This resource is focused on 2 of the 7 targets at El Guayabo that have produced mineralised intercepts greater than 500 metres. Mineralisation on these two targets remains open in all directions along strike and at depth with the resource limited by a lack of drilling. Additionally, the final five holes in the program are yet to be included in the estimate which will be updated when assays for these holes are received."

Challenger Gold (ASX: CEL) (“CEL” the “Company”) is pleased to announce a first Mineral Resource Estimate (MRE) which is reported according to JORC (2012) for the Company's El Guayabo Gold Copper Project, in El Oro Province, Ecuador. 

 


Contact details:

Jane Morgan

jm@janemorganmanagement.com.au

Media

More from this category

  • Business Company News, Finance Investment
  • 15/01/2025
  • 11:30
Wednesday 15 January 2025

IFM INVESTORS ANNOUNCES SIGNIFICANT GROWTH INVESTMENT IN SPLEND

IFM Investors is pleased to announce a significant investment in Splend Group Pty Ltd (Splend), an Australian-owned company that is a leading provider of subscription vehicles to rideshare drivers across Australia and the United Kingdom. IFM’s Growth Partners Fund 2 is investing in Splend alongside HESTA (through HESTA’s mandate with IFM) and other co-investors, to acquire a stake of 49% in the company. Founded in 2015, Splend has one of the largest electric vehicle fleets in Australia and is supporting rideshare drivers to adopt lower emission vehicles through its all-inclusive flexible finance and ownership offerings whilst improving their earnings capacity.…

  • Business Company News, Finance Investment
  • 15/01/2025
  • 10:35
ABX Group (ASX: ABX)

ABx Group’s subsidiary, ALCORE, enters into agreement with Rio Tinto Aluminium to establish continuous pilot plant near the Bell Bay aluminium smelter in northern Tasmania.

ABx Group Limited (ASX: ABX) ("ABx" or "the Company") and its 83%-owned subsidiary, ALCORE Limited ("ALCORE"), are pleased to announce that it has entered into a lease agreement with Rio Tinto Aluminium Limited for an industrial facility adjacent to its Bell Bay aluminium smelter in northern Tasmania. ALCORE will establish a pilot plant at the facility to demonstrate its world-first proprietary process to produce industrial chemicals, including hydrogen fluoride, from a waste product created during the aluminium smelting process. In the planned subsequent commercial plant, hydrogen fluoride will be converted to aluminium fluoride, an essential chemical for aluminium smelting that…

  • Contains:
  • Finance Investment, Taxation
  • 15/01/2025
  • 10:05
Tax Practitioners Board

New Administrative Review Tribunal affirms TPB decision to protect public interest

The new Administrative Review Tribunal (ART) has rejected an application on appeal by former Gold Coast tax agent, Philippe Colin (also known as Phil Colin) to overturn the Tax Practitioners Board’s (TPB) decision to terminate his registration and impose a 4-year ban from reapplying. Mr Colin’s registration was terminated after the TPB found he had breached 5 items of the Code of Professional Conduct (Code) and no longer satisfied the fit and proper person requirements to be registered. A TPB investigation ascertained Mr Colin lodged amendments to clients’ income tax returns without their authorisation and claimed unsubstantiated deductions despite receiving…

  • Contains:

Media Outreach made fast, easy, simple.

Feature your press release on Medianet's News Hub every time you distribute with Medianet. Pay per release or save with a subscription.