- Three drill holes each returned more than 230 metres of gold mineralisation. The longest interval at Golden Gate North was 272.2 metres at 0.55 g/t gold from surface. Another hole returned 264.9 metres at 0.59 g/t gold from surface, including 18.7 metres at 2.19 g/t gold. These are downhole lengths.
- The results strengthen evidence of a continuous higher-grade gold zone. The new holes tested ground between earlier intersections within a zone about 500 metres long and an estimated 200 metres in true width.
- Assays are pending for 30 of the 42 holes drilled in 2026. Resolution plans to use the remaining results to build its first Golden Gate mineral resource model and expects to release the results of that work in Q1 2027, subject to completing the analysis.
18 November 2026 – Adelaide, SA | Resolution Minerals (ASX: RML) has reported three gold drill intersections of more than 230 metres at its Horse Heaven project in Idaho, strengthening evidence that higher-grade gold forms a continuous zone and supporting work towards a first mineral resource estimate.
The three holes tested ground between earlier gold intersections at Golden Gate North. The results help define the higher-grade core within a mineralised zone that stretches about 500 metres and has an estimated true width of about 200 metres. Drilling has yet to define its limits to the northeast, southwest and at depth.
The longest new intersection ran 272.2 metres from surface and averaged 0.55 grams of gold per tonne. A second hole returned 264.9 metres at 0.59 grams per tonne from surface, including 18.7 metres at 2.19 grams per tonne. Those lengths are measured along the drill holes.
Craig Lindsay, Resolution’s CEO of US Operations, said:
“The assay results continue to strengthen the case for a major zone of gold mineralisation at the Golden Gate North deposit. Increasingly, we are seeing the characteristics of reduced intrusive related gold deposits at Golden Gate. This aligns with our long held view that the neighbouring Stibnite deposit is a valid analogue for Golden Gate North, Golden Gate South and Antimony Ridge, as related components of a single large mineralised system.”
Results are pending for 30 of the 42 holes drilled across Golden Gate North and South in 2026. Resolution plans to report tungsten assays separately and use the remaining drill results to build an initial mineral resource model. The company expects to release the results of that work in the first quarter of 2027, subject to completing the analysis.
Permitting is under way for the planned 2027 exploration program, which includes drilling to test the two-kilometre corridor between Golden Gate North and South and the first drilling at Antimony Ridge.
Contact details:
Aharon Zaetz
Executive Director
Resolution Minerals Ltd
M: +61 424 743 098
[email protected]
Jane Morgan
Investor Relations
Jane Morgan Management
M: +61 405 555 618